DeutschEnglishРусский

 

The grand opening is approaching, on the construction schedule is only very little space. All trades calculate their own scope, until the last tile everything is perfect set at the last minute. But does not one have to have a permit from the health department before the opening? Do not you have to check the biological parameters first? Does not the water have to be disinfected before that? Do not you have to turn on the water treatment before that? Do not you have to have water in the pool before that? How fast can the pools be filled with the existing connection? Do the tilers have "underwater work" in their contract?

Often it comes, to answer these questions immediately and to optimize the route to the target. It need not be a World Cup, in which a schedule for stadium construction is observed. It may also be, that a respectable personality with a full schedule will open the swimming pool effective advertising. But it can also be, that a public authority wants to prevent the opening.

You want to know, how to set a realistic timetable and how to optimize the plan? Then take now Contact to.