2020 … 2021 Herscheid – Doubling of the volume flow at the vacuum precoat filter

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

2011 … 2012 Kükelhaus-school pool with hydraulic movable floor

The Kükelhaus School in Magdeburg, the building was 2009 built. For the children and young people a pool was designed with height-adjustable floor. As a base, a concrete construction should serve, which are lined in the system "Myrthapools" and with a height movable floor (Hubboden) should be equipped.

error: Content is protected !!